North Pemiscot Co. R-I

Back
Example Zoom search template page
Search for: Results per page:

Match: any search words all search words


P 7131 Design - Build Selection

Where appropriate the District may utilize a design-build method for construction of a specific project. Under this method of construction, a construction entity provides architectural, engineering, labor, material, supplies and equipment related to the construction itself.  If the Board chooses a design-build method, the procedures of Regulation 7131 shall be followed.


Date Modified: August 2016